Setup approval including dimensional, Profile and Contour inspection is done before start of production.
-
In-process inspection is carried out by process inspectors as per the control plan for all drawing parameters including dimensions, GD & T parameters and surface defects.
-
Cp and Cpk values of more than 1.66 are ensured through run charts, histogram and SPC study.